Scheduling-based risk estimation and safety planning for construction projects

Kyoo-Jin Yi, David A. Lanford

Research output: Contribution to journalArticle

Abstract

This paper considers the issue of safety risks on construction sites. It introduces the concept of combined effect of different risk factors to the accident. For proper safety planning, safety managers need to be well aware of the direct causes of the accident as well as indirect factors that adversely effect on site safety. If it is observed that if a hazardous environment exists at the site, then either that hazardous environment must be eliminated or occupations and processes related to that hazard must be properly protected. One of the measures for evading such hazardous situations is to predict such situations and to reschedule the start time of high-risk situation so that risks are not concentrated during certain periods and at certain locations. In order to predict when and where the risk will reach its highest level, analysis should be performed based upon various information including statistical sources such as accident histories and this should be done in coordination with the activity scheduling. This paper analyzes the result of accident history and provides information about vulnerable situations. In addition, it presents a theory of safety planning method which estimates the risk distribution of a project and helps the safety manager to both estimate situations of concentrated risk and then to reschedule it when it is necessary.

Original languageEnglish
JournalJournal of Construction Engineering and Management
DOIs
Publication statusPublished - 1 Jun 2006

Fingerprint

Scheduling
Planning
Accidents
Managers
Safety
Estimation risk
Construction project
Hazards

Keywords

  • safety
  • construction sites
  • risk factors

Cite this

@article{3b71199a24c949028a00df4eb8dd3ab1,
title = "Scheduling-based risk estimation and safety planning for construction projects",
abstract = "This paper considers the issue of safety risks on construction sites. It introduces the concept of combined effect of different risk factors to the accident. For proper safety planning, safety managers need to be well aware of the direct causes of the accident as well as indirect factors that adversely effect on site safety. If it is observed that if a hazardous environment exists at the site, then either that hazardous environment must be eliminated or occupations and processes related to that hazard must be properly protected. One of the measures for evading such hazardous situations is to predict such situations and to reschedule the start time of high-risk situation so that risks are not concentrated during certain periods and at certain locations. In order to predict when and where the risk will reach its highest level, analysis should be performed based upon various information including statistical sources such as accident histories and this should be done in coordination with the activity scheduling. This paper analyzes the result of accident history and provides information about vulnerable situations. In addition, it presents a theory of safety planning method which estimates the risk distribution of a project and helps the safety manager to both estimate situations of concentrated risk and then to reschedule it when it is necessary.",
keywords = "safety, construction sites, risk factors",
author = "Kyoo-Jin Yi and Lanford, {David A.}",
note = "Originally published in: Journal of Construction Engineering and Management (2006), 132 (6), pp.626-635.",
year = "2006",
month = "6",
day = "1",
doi = "10.1061/(ASCE)0733-9364(2006)132:6(626)",
language = "English",
journal = "Journal of Construction Engineering and Management",
issn = "0733-9364",
publisher = "American Society of Civil Engineers (ASCE)",

}

Scheduling-based risk estimation and safety planning for construction projects. / Yi, Kyoo-Jin; Lanford, David A.

In: Journal of Construction Engineering and Management, 01.06.2006.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Scheduling-based risk estimation and safety planning for construction projects

AU - Yi, Kyoo-Jin

AU - Lanford, David A.

N1 - Originally published in: Journal of Construction Engineering and Management (2006), 132 (6), pp.626-635.

PY - 2006/6/1

Y1 - 2006/6/1

N2 - This paper considers the issue of safety risks on construction sites. It introduces the concept of combined effect of different risk factors to the accident. For proper safety planning, safety managers need to be well aware of the direct causes of the accident as well as indirect factors that adversely effect on site safety. If it is observed that if a hazardous environment exists at the site, then either that hazardous environment must be eliminated or occupations and processes related to that hazard must be properly protected. One of the measures for evading such hazardous situations is to predict such situations and to reschedule the start time of high-risk situation so that risks are not concentrated during certain periods and at certain locations. In order to predict when and where the risk will reach its highest level, analysis should be performed based upon various information including statistical sources such as accident histories and this should be done in coordination with the activity scheduling. This paper analyzes the result of accident history and provides information about vulnerable situations. In addition, it presents a theory of safety planning method which estimates the risk distribution of a project and helps the safety manager to both estimate situations of concentrated risk and then to reschedule it when it is necessary.

AB - This paper considers the issue of safety risks on construction sites. It introduces the concept of combined effect of different risk factors to the accident. For proper safety planning, safety managers need to be well aware of the direct causes of the accident as well as indirect factors that adversely effect on site safety. If it is observed that if a hazardous environment exists at the site, then either that hazardous environment must be eliminated or occupations and processes related to that hazard must be properly protected. One of the measures for evading such hazardous situations is to predict such situations and to reschedule the start time of high-risk situation so that risks are not concentrated during certain periods and at certain locations. In order to predict when and where the risk will reach its highest level, analysis should be performed based upon various information including statistical sources such as accident histories and this should be done in coordination with the activity scheduling. This paper analyzes the result of accident history and provides information about vulnerable situations. In addition, it presents a theory of safety planning method which estimates the risk distribution of a project and helps the safety manager to both estimate situations of concentrated risk and then to reschedule it when it is necessary.

KW - safety

KW - construction sites

KW - risk factors

U2 - 10.1061/(ASCE)0733-9364(2006)132:6(626)

DO - 10.1061/(ASCE)0733-9364(2006)132:6(626)

M3 - Article

JO - Journal of Construction Engineering and Management

JF - Journal of Construction Engineering and Management

SN - 0733-9364

ER -