Probabilistic modeling and analysis of a cable plant subsystem with priority to repair over preventive maintenance

S.Z. Taj, S.M. Rizwan, B.M. Alkali, D.K. Harrison, G. Taneja

Research output: Contribution to journalArticlepeer-review

292 Downloads (Pure)

Fingerprint

Dive into the research topics of 'Probabilistic modeling and analysis of a cable plant subsystem with priority to repair over preventive maintenance'. Together they form a unique fingerprint.

Keyphrases

Engineering

Mathematics