Project Details
Description
To study the feasibility of inducing sufficient currents in a real power cable from a mobile energy source under typical real life conditions where the cable is buried underground
To study the real time measurements obtained to identify location and types of cable faults.
To study the real time measurements obtained to identify location and types of cable faults.
Status | Finished |
---|---|
Effective start/end date | 1/02/19 → 31/07/22 |
Funding
- SP Energy Networks, Scottish Power Ltd: £30,000.00
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.